Hello Colleagues,
I need to create a validation by the period of the budget :
Using FMCCA/FMCCD, I have these options :
But the Budget line Period is returning only the value 16, I would need the values 1-12, is this possible ?
I've tried to use key Figures but it's not possible to select the period also.
Thanks in advance.
Filipe Santos.